Journal of Engineering and Applied Sciences

Year: 2017
Volume: 12
Issue: 5 SI
Page No. 6911 - 6915

A Review of Supply Chain Management in IBS Construction Industry: Challenges

Authors : M.A. Fauzi, S.H. Hassan, J.N. Yunus, H. Sulaiman and N.A. Ramli

References

Akintoye, A., G. McIntosh and E. Fitzgerald, 2000. A survey of supply chain collaboration and management in the UK construction industry. Eur. J. Purchasing Supply Manage., 6: 159-168.
Direct Link  |  

Ankomah, E.N., B.K. Baiden and J.K.O. Kuragu, 2015. Lean techniques approaches to managing ghanaian contractor supply chains. Intl. J. Constr. Eng. Manage., 4: 87-94.
CrossRef  |  Direct Link  |  

Austin, S., A. Newton, J. Steele and P. Waskett, 2002. Modelling and managing project complexity. Intl. J. Project Manage., 20: 191-198.
Direct Link  |  

Baiden, B.K., 2006. Framework for the integration of the project delivery team. Master Thesis, Loughborough University, Loughborough, England, UK.

Baiden, B.K., A.D.F. Price and A.R.J. Dainty, 2006. The extent of team integration within construction projects. Int. J. Project Manage., 24: 13-23.
CrossRef  |  

Blismas, N. and R. Wakefield, 2009. Drivers, constraints and the future of offsite manufacture in Australia. Constr. Innovation, 9: 72-83.
Direct Link  |  

Chinowsky, P.S. and R.E. Goodman, 1996. Managing interdisciplinary project teams through the Web. J. UCS., 2: 597-609.
Direct Link  |  

Delfani, M., R. Ibrahim, M.Y.M. Raschid, F. Hejazi and N.A. Haron, 2016. Towards designing modular of industrialized building systems. J. Teknologi, 78: 387-391.

Evbuomwan, N.F.O. and C.J. Anumba, 1998. An integrated framework for concurrent life-cycle design and construction. Adv. Eng. Software, 29: 587-597.
CrossRef  |  Direct Link  |  

Hallowell, M. and T.M. Toole, 2009. Contemporary design-bid-build model. J. Constr. Eng. Manage., 135: 540-549.
Direct Link  |  

Jabar, L.I., F. Ismail and A.A. Mustafa, 2013. Issues in managing construction phase of IBS projects. Procedia Social Behav. Sci., 101: 81-89.
Direct Link  |  

Jha, K.N. and K.C. Iyer, 2006. Critical determinants of project coordination. Intl. J. Project Manage., 24: 314-322.
Direct Link  |  

Kamar, K.A.M. and Z.A. Hamid, 2011. Supply chain strategy for contractor in adopting Industrialised Building System (IBS). Aust. J. Basic Appl. Sci., 5: 2552-2557.

Kamar, K.A.M., M. Alshawi and Z. Hamid, 2009. Industrialised building system: The critical success factors. Proceedings of the 9th International Conference on Postgraduate Research (IPGRC), January 29-30, 2009, University of Salford, Greater Manchester, UK., pp: 29-30.

Khalfan, M., H. Khan and T. Maqsood, 2015. Building information model and supply chain integration: A review. J. Econ. Bus. Manage., 3: 912-916.

Love, P.E., A. Gunasekaran and H. Li, 1998. Concurrent engineering: A strategy for procuring construction projects. Intl. J. Project Manage., 16: 375-383.
Direct Link  |  

Mentzer, J.T., W. DeWitt, J.S. Keebler, S. Min, N.W. Nix, C.D. Smith and Z.G. Zacharia, 2001. Defining supply chain management. J. Bus. Logist., 22: 1-25.
CrossRef  |  Direct Link  |  

Mohammad, M.F., A.S.A. Shukor, R. Mahbub and F.M. Halil, 2014. Challenges in the integration of supply chains in IBS project environment in Malaysia. Procedia Social Behav. Sci., 153: 44-54.
Direct Link  |  

Nawi, M., M. Nasrun, A. Nifa, F. Akmar and M. Kamar et al., 2014. Modern method of construction: An experience from UK construction industry. Aust. J. Basic Appl. Sci., 8: 527-532.
Direct Link  |  

Nawi, M.N.M., A. Lee and M. Arif, 2010. The IBS barriers in the Malaysian construction industry: A study in construction supply chain perspective. Proceedings of the 18th CIB World Building Congress on InTG57-Special Track, May 10-13, 2010, University of Salford, Salford, UK., pp: 77-93.

Nawi, M.N.M., M.N.A. Azman, W.N. Osman, K. Radzuan and M. Yaakob, 2016. Key success factors for team integration practice in Malaysian Industrialised Building System (IBS) construction industry. Geografia Malaysian J. Soc. Space, 12: 88-94.

Rahman, A.B.A. and W. Omar, 2006. Issues and challenges in the implementation of industrialised building systems in Malaysia. Proceedings of the 6th Asia-Pacific Conference on Structural Engineering and Construction (APSEC 2006), September 5-6, 2006, Universiti Teknologi Malaysia, Kuala Lumpur, Malaysia, pp: 5-6.

Rowlinson, S. and F.Y.K. Cheung, 2004. A review of the concepts and definitions of the various forms of relational contracting. Proceedings of the International Symposium on of the CIB W92 on Procurement Systems Project Procurement for Infrastructure Construction, January 7-10, 2004, QUT, Chennai, India, pp: 227-236.

Salleh, D., M. Melan and W.N. Osman, 2014. The roles of leadership management in promoting supply chain management; Managing for a better freight movement at cross border checkpoints. Study Commer. Vehicles Ind. Between Malaysia Thailand, 1: 8-17.

Shukor, A.S.A., M.F. Mohammad, R. Mahbub and F. Ismail, 2011. Supply chain integration challenges in project procurement in Malaysia: The perspective of IBS manufacturers. Proceedings of the 27th Annual ARCOM Conference on Association of Researchers in Construction Management, September 5-7, 2011, Bristol Publisher, Bristol, England, UK., pp: 495-504.

Vrijhoef, R. and L. Koskela, 1999. Roles of Supply Chain Management in Construction. University of California, Berkeley, California, pp: 133-146.

Warszawski, A., 1999. Industrialized and Automated Building Systems: A Managerial Approach. 2nd Edn., Routledge, USA., ISBN-13: 978-0419206200, Pages: 480.

Wilding, R. and A.S. Humphries, 2006. Understanding collaborative supply chain relationships through the application of the Williamson organisational failure framework. Intl. J. Phys. Distribution Logistics Manage., 36: 309-329.
Direct Link  |  

Yunus, R. and J. Yang, 2012. An integrated approach to enhance sustainability in industrialised building systems. Proceedings of the 8th Conference on Asia Pacific Structural Engineering and Construction, October 2-4, 2012, Queensland University of Technology, Brisbane, Queensland, pp: 262-267.

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved