Journal of Engineering and Applied Sciences

Year: 2017
Volume: 12
Issue: 4
Page No. 981 - 987

Estimating Volume of Settled Sediment Base on Flood Discharge Plan in T-Year Period Bili-Bili Reservoir

Authors : Abdul Rivai Suleman, Zulvyah Faisal, Muh. Taufik Iqbal and Devi Ayu Puspita

References

Aisyah, A.L., 2012. [Prediction of sedimentation in DAS mamasa mamasa in West Sulawesi province]. Master Thesis, Universitas Hasanuddin, Makassar, Indonesia. (In Indonesian)

Bambang, T., 2008. [Applied Hydrology]. Penerbit Beta Offset, Yogyakarta, Indonesia, (In Indonesian).

Fattinaware, I., 2010. [Suing community bili-bili dam from the forest to the debt]. World Press, Indonesia. (In Indonesian) https://basriandang.wordpress.com/2010/08/05/masyarakat-menggugat-waduk-bili-bili-dari-hutan-sampai-ke-utang/.

Sriyono, E., 2012. [Analysis of the draft flood rehabilitation debit situ sidomukti]. J. Eng., 2: 78-87.
Direct Link  |  

Suripin, 2013. [Sustainable Urban Drainage Systems]. Penerbit Andi, Yogyakarta, Indonesia, (In Indonesian).

Tatipata, W.H., I. Soekarno, A. Sabar and S. Legowo, 2015. [Volume analysis sediment settles after T-year reservoir operations (Studi Kasus: Waduk Cirata) (In Indonesian)]. Civil Eng. J., 22: 235-242.
Direct Link  |  

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved