International Journal of Electrical and Power Engineering
Year: 2011 | Volume: 5 | Issue: 3 | Page No.: 131-138
DOI: 10.3923/ijepe.2011.131.138  
Design and Construction of a 5 kW Turbine for a Proposed Micro Hydroelectric Power Plant Installation at Awba Dam University of Ibadan
T. Ajuwape and O.S. Ismail
 
Citations
Citation Not Found