Journal of Engineering and Applied Sciences
Year:
2018
Volume:
13
Issue:
9
Page No.
2570 - 2574
References
Abdrazakov, F.K., A.V. Pomorova, M.A. Shchenyatskaya and O.V. Litvishko, 2015. Organizational partnership for building, reconstruction and capital overhaul of hydrotechnical structures. Intl. Bus. Manage., 9: 1163-1168.
CrossRef | Direct Link | Al-Awad, O.S., 2015. The uptake of advanced IT with specific emphasis on BIM by SMEs in the Jordanian construction industry. Ph.D Thesis, University of Salford, Greater Manchester, England, UK.
Ali, A.A.A., M.R.B. Abdulkader and R.S.M. Jawad, 2009. Variation orders in construction projects. J. Eng. Applied Sciences, 4: 170-176.
CrossRef | Direct Link | Assaf, S.A. and S. Al-Hejji, 2006. Causes of delay in large construction projects. Int. J. Project Manage., 24: 349-357.
CrossRef | Le-Hoai, L., Y.D. Lee and J.Y. Lee, 2008. Delay and cost overruns in vietnam large construction projects: A comparison with other selected countries. KSCE J. Civil Eng., 12: 367-377.
CrossRef | McEniry, G. and W. Ibbs, 2007. The cumulative effect of change orders on labour productivity: The Leonard study reloaded. Revay Rep., 26: 1-8.
Direct Link | Ndihokubwayo, R., 2009. Variation orders on construction projects: Value-adding or waste?. Intl. J. Constr. Project Manage., 1: 1-17.
Direct Link | Oladapo, A.A., 2007. A quantitative assessment of the cost and time impact of variation orders on construction projects. J. Eng. Design Technol., 5: 35-48.
CrossRef | Oloo, D.D., G. Munala and W. Githae, 2014. Factors contributing to variation orders: A survey of civil engineering construction projects in Kenya. Intl. J. Soc. Sci. Entrepreneurship, 1: 425-437.
Sterman, J.D., 1992. System dynamics modeling for project management. Master Thesis, Cambridge, Massachusetts. http://web.mit.edu/jsterman/www/SDG/project.pdf
Sweis, G., R. Sweis, A. Abu Hammad and A. Shbould, 2008. Delays in construction projects: The case of Jordan. Int. J. Project Manage., 26: 665-674.
CrossRef |