Research Journal of Applied Sciences

Year: 2018
Volume: 13
Issue: 1
Page No. 26 - 33

Methodology for Investigation of Risk Based Maintenance (MIRBA) for Mobile Mooring System

Authors : Silvianita , Mohd. Faris Khamidi, Suntoyo and Dirta Marina Chamelia

References

ABS., 2001. Principles of risk based decision making. Canberra, Australia.

API., 1993. Recommended practice for design and hazards analysis for offshore production facilities. Application Programming Interface, Washington.

Arunraj, N.S. and J. Maiti, 2010. Risk-based maintenance policy selection using AHP and goal programming. Safety Sci., 48: 238-247.
Direct Link  |  

Badreddine, A. and N.B. Amor, 2010. A dynamic barriers implementation in Bayesian-based bow tie diagrams for risk analysis. Proceedings of the 2010 IEEE/ACS International Conference on Computer Systems and Applications (AICCSA), May 16-19, 2010, IEEE, Hammamet, Tunisia, ISBN:978-1-4244-7717-3, pp: 1-8.

Bertolini, M. and M. Bevilacqua, 2006. A combined goal programming-AHP approach to maintenance selection problem. Reliab. Eng. Syst. Saf., 91: 839-848.
Direct Link  |  

Cockshott, J.E., 2005. Probability bow-ties: A transparent risk management tool. Process Saf. Environ. Prot., 83: 307-316.
Direct Link  |  

Dawotola, A.W., P.H.A.J.M.V. Gelder and J.K. Vrijling, 2011. Decision analysis framework for risk management of crude oil pipeline system. Adv. Decis. Sci., 2017: 1-17.
Direct Link  |  

Delvosalle, C., C. Fievez, A. Pipart, J.C. Fabrega and E. Planas et al., 2005. Identification of reference accident scenarios in SEVESO establishments. Reliab. Eng. Syst. Saf., 90: 238-246.
Direct Link  |  

Dey, P.K., 2001. A risk-based model for inspection and maintenance of cross-country petroleum pipeline. J. Qual. Maintenance Eng., 7: 25-43.
Direct Link  |  

Fowler, D., 2003. EUR RVSM POSC development FHA review report. Farrer Huxley Associates, London, England.

Gowland, R., 2006. The accidental risk assessment methodology for industries (ARAMIS)/layer of protection analysis (LOPA) methodology: A step forward towards convergent practices in risk assessment?. J. Hazard. Mater., 130: 307-310.
Direct Link  |  

HSE., 2009. Accident statistics for offshore units on the UKCS 1990-2007. UK Oil and Gas Industry Association Limited, London, England, UK.

IMO., 1997. Interim guidelines for the Application of Formal Safety Assessment (FSA) to the IMO rule making process. International Maritime Organization, London, England.

Khamidi, M., K. Sambodho, N. Syahroni, Y. Mulyadi and M. Zikra, 2016. Investigation of Risk Based Decision Making for Mobile Mooring System. In: Applied Mechanics and Materials, Sutardi, B.P., R.D.M. Abu-Ayyad and L. Jiing-Yih (Eds.). Trans Tech Publications, Switzerland, pp: 233-238.

Ling, X., 2001. Introduction to Multi Criteria Decision Making and the Evidential Reasoning Approach. University of Manchester, Manchester, UK., ISBN:9781861151117,.

Shafiq, N., 2010. Prioritizing the pipeline maintenance approach using analytical hierarchical process. Intl. Rev. Mech. Eng., 4: 346-352.

Silvianita, M.F.K. and V.J. Kurian, 2013. Decision making for safety assessment of mobile mooring system. Jurnal Teknologi Sciences Engineering, 61: 41-52.

Thomas, L.S., 1988. The Analytic Hierarchy Process. University of Pittsburgh Press, Pittsburgh, Pennsylvania, USA., ISBN:9780070543713, Pages: 440.

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved