Asian Journal of Information Technology

Year: 2012
Volume: 11
Issue: 6
Page No. 186 - 193

Investigating Dynamics of Software Project Quality under Requirement Volatility Patterns

Authors : RahulThakurta

References

Abdel-Hamid, T.K. and S.E. Madnick, 1991. Software Project Dynamics: An Integrated Approach. Prentice Hall, Englewood Cliffs, NJ, USA.

Abdel-Hamid, T.K., 1988. The economics of software quality assurance: A simulation-based case study. MIS Q., 12: 395-411.
Direct Link  |  

Barry, E.J., C.F. Kemerer and S. Slaughter, 2006. Environmental volatility, development decisions and software volatility: A longitudinal analysis. Manage. Sci., 52: 448-464.
Direct Link  |  

Basili, V.R. and H.D. Rombach, 1987. Tailoring the software process to project goals and environments. Proceedings of the 9th International Conference on Software Engineering, (ICSE'87), IEEE Computer Society Press Los Alamitos, CA, USA., pp: 345-357.

Black, L.J. and N.P. Repenning, 2001. Why firefighting is never enough: Preserving high-quality product development. Syst. Dyn. Rev., 17: 33-62.
CrossRef  |  

Boehm, B.W., 1991. Software risk management: Principles and practices. IEEE Software, 8: 32-41.
CrossRef  |  

Boehm, C.B., B. Boehm, B. Clark, E. Horowitz, C. Westl, R. Madachy and R. Selby, 1995. Cost models for future software life cycle processes: COCOMO2.0. Ann. Software Eng., 1: 57-94.
CrossRef  |  

Collofello, J., I. Rus, A. Chauhan, D. Houston, D.M. Sycamore and D. Smith-Daniels, 1998. A system dynamics software process simulator for staffing policies decision support. Proceedings of the 31st Hawaii International Conference on System Sciences, Jan 6-9, 1998, Kohala Coast, HI, pp: 103-111.

Costello, R.J. and D.B. Liu, 1995. Metrics for requirements engineering. J. Syst. Software, 29: 39-63.
CrossRef  |  

Crawford, L. and J. Pollack, 2004. Hard and soft projects: A framework for analysis. Int. J. Project Manage., 22: 645-653.
CrossRef  |  

Davis, A.M., N. Nurmuliani, S. Park and D. Zowghi, 2008. Requirements change: What's the alternative? Proceedings of the 32nd Annual IEEE International Computer Software and Applications, July 28-August 1, 2008, Turku, Finland, pp: 635-638.

Ferreira, S., J. Collofello, D. Shunk and G. Mackulak, 2009. Understanding the effects of requirements volatility in software engineering by using analytical modeling and software process simulation. J. Syst. Software, 82: 1568-1577.
CrossRef  |  

Hoorn, J.F., E.A. Konijn, H. van Vliet and G. van der Veer, 2007. Requirements change: Fears dictate the must haves; desires the won't haves. J. Syst. Software, 3: 328-355.
CrossRef  |  

Joglekar, N.R. and D.N. Ford, 2005. Product development resource allocation with foresight. Eur. J. Oper. Res., 160: 72-87.
CrossRef  |  

Jones, C., 1998. Estimating Software Costs. McGraw Hill, London, UK.

Kontonya, G. and I. Sommerville, 2002. Requirements Engineering Process and Techniques. Wiley Publications, UK.

Lee, Z.W., D.N. Ford and N. Joglekar, 2007. Effects of resource allocation policies for reducing project durations: A systems modeling approach. J. Syst. Res. Behav. Sci., 24: 551-566.

Li, Q., F. Shu, B. Boehm and Q. Wang, 2010. Improving the ROI of software quality assurance activities: An empirical study. Proceedings of the 2010 International Conference on New Modeling Concepts for Today's Software Processes: Software Process, July 8-9, 2010, Paderborn, Germany, pp: 357-368.

Liu, S., T. Tamai and S. Nakajima, 2009. Integration of formal specification, review and testing for software component quality assurance. Proceedings of the 2009 ACM Symposium on Applied Computing, March 8-12, 2009, Honolulu, HI, USA., pp: 415-421.

Madachy, R.J., 1994. A software project dynamics model for process cost, schedule and risk assessment. Ph.D. Thesis, Department of Industrial and Systems Engineering, University of Southern, California, Los Angeles.

Nurmuliani, N., D. Zowghi and S. Fowell, 2004. Analysis of requirements volatility during software development life cycle. Proceedings of the 2004 Australian Software Engineering Conference, April 13-16, 2004, Innsbruck, Austria, p: 28-37-.

Plekhanova, V., 1999. Capability and compatibility measurement in software process improvement. Proceedings of the 2nd European Software Measurement Conference, October 4-8, 1999, Amsterdam, Netherlands -.

Royce, W.W., 1987. Managing the development of large software systems: Concepts and techniques. Proceedings of the IEEE 9th International Conference on Software Engineering, March 30- April 2, 1987. California, USA., pp: 328-338.

Sterman, J.D., 2000. Business Dynamics: Systems Thinking and Modeling for a Complex World. McGraw-Hill, Irwin, USA.

Thakurta, R. and F. Ahlemann, 2010. Understanding requirements volatility in software projects-an empirical investigation of volatility awareness, management approaches and their applicability. Proceedings of the 43rd Hawaii International Conference on System Sciences, January 5-8, 2010, Honolulu, HI, pp: 1-10.

Thakurta, R., R. Roy and S. Bhattacharya, 2009. Impact of requirements discovery pattern on software project outcome: preliminary results. Proceedings of the 42nd Annual Hawaii International Conference on System Sciences, January 5-8, 2009, Big Island, HI, pp: 1-6.

Wagner, S., K. Lochmann, S. Winter, A. Goeb and M. Klaes, 2009. Quality models in practice: A preliminary analysis. Proceedings of the 3rd International Symposium on Empirical Software Engineering and Measurement, Ocotober 15-16, 2009, Washington, DC, USA. -.

Wiegers, K., 1999. Software Requirements. Microsoft Press, Redmond, USA.

Young, R.R., 2001. Effective Requirements Practices. Addison-Wesley, Boston.

Zowghi, D. and N. Nurmuliani, 2002. A study on the impact of requirements volatility on software project performance. Proceedings of the 9th Asia Pacific Software Engineering Conference, December 4-6, 2002, Queensland, Australia, pp: 3-11.

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved